ā片在线观看,无码人妻精品一二三区免费,国产精品一国产精品,亚洲伊人色欲综合网

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機(jī)的生產(chǎn)與制造

24小時全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.sxfxcm.com

當(dāng)前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺佑電子 | 作者:臺佑電子 | 發(fā)表時間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

女邻居丰满的奶水| 亚洲欧美精品suv| 野狼第一精品社区| 高潮抽搐潮喷毛片在线播放| 亚洲熟妇久久精品| 久久久精品一区aaa片| 国产成人无码区免费网站| 中文字幕无码毛片免费看| 国产亚洲精品aaaa片app| 成在人线av无码免费高潮喷水 | 日本三级香港三级人妇99| 免费观看mv大片高清| 偷看农村妇女牲交| 精品国产三级a∨在线| 国产精品美女久久久| 五月丁香综合激情六月久久| 欧美极品少妇×xxxbbb| 国产美女精品一区二区三区| 色婷婷一区二区三区四区成人网| 久久久精品456亚洲影院| 亚洲区小说区图片区qvod| 日本伊人精品一区二区三区| аⅴ天堂中文在线网| 久久精品国产99国产精品| 中文字幕av免费专区| 纯爱无遮挡h肉动漫在线播放| 亚洲国产精品成人精品无码区在线| 少妇真实被内射视频三四区| 亚洲欧美日韩人成在线播放| 国产a国产片国产| 人妻夜夜爽天天爽三区麻豆av网站| 亚洲av中文无码乱人伦在线r▽| 免费人成激情视频在线观看冫| 国产国产裸模裸模私拍视频| 国产精品久久久久久久| 免费看av在线网站网址| 中文字幕乱码人妻综合二区三区| 亚洲av永久无码天堂网毛片| 色窝窝无码一区二区三区成人网站 | 国产香港明星裸体xxxx视频| 亚洲av人无码激艳猛片服务器|