ā片在线观看,无码人妻精品一二三区免费,国产精品一国产精品,亚洲伊人色欲综合网

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機(jī)的生產(chǎn)與制造

24小時(shí)全國服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.sxfxcm.com

當(dāng)前位置:首 頁 ? News ? Industry trends

Operation elements of vertical injection molding machine

文章出處:臺(tái)佑電子 | 作者:臺(tái)佑電子 | 發(fā)表時(shí)間:2020-07-07

In the plastics processing industry, Shenzhen Taiyou Vertical Injection Molding Machine is a kind of expensive injection molding equipment. The output of vertical injection molding products accounts for more than 30% of the total amount of plastic products. It has the characteristics of high production automation, short production cycle, strong adaptability and high production capacity. Except for fluoroplastics, almost all thermoplastics can be molded by this equipment. Relay) contactor control system is usually used for mold clamping, injection, holding pressure and mold opening of the original injection molding machine. The wiring of detection elements is chaotic, the reliability is poor, and the integration is low. In order to improve the function of the injection molding machine and improve the reliability of its production process.


The operation process of vertical injection molding machine can be roughly divided into: preheating, mold clamping, injection, calendering and holding, mold opening, top punching, flash evaporation and other processes. These processes are batch production processes, and each process can be controlled according to changes in time or direction. At different times or directions, the device's travel switch or proximity switch advocates the timer of the central processor to start timing. If the motion mechanism reaches the end point or the specified orientation within the specified time, the corresponding travel switch or proximity switch will be triggered, the system will consider that the execution of the action has ended at this time, otherwise it will stop the machine and issue a defect alarm. Because the vertical injection molding machine has many movements, some movements require skills, so multiple orientation control points must be set to switch parameters. In the process of time care, one after another is advocated, distinguishing the actions at the time, and after admitting that they are correct, opening or closing the corresponding implementing agencies and ending the routine actions. The entire production process has gone through seven processes, so this system can control the automatic end of these seven processes in turn.


The quality of the injection molded product depends on the manipulation of the technical parameters of the injection molding process, including the input variables of the simulation method, such as the barrel temperature, polymer melt temperature, screw temperature, mold temperature, injection system pressure, screw speed, etc. The digital variable method inputs variables, such as the continuous direction of the screw exit, the front and back direction of the injection seat, the front and back movement of the template, and overtravel, etc. The programmable controller technology was used to transform the injection molding machine system, overcoming the shortcomings of the traditional open-loop control method, and ending the closed-loop control, so that the anti-interference ability and control accuracy of the programmable controller control method were greatly improved compared with the traditional method. It can not only control the switching logic, but also control the analog quantity (such as temperature, pressure, flow, speed, etc.). By closed loop with the help of keyboard and liquid crystal display or digital ladder diagram, the operation process ends. There are three kinds of ladder diagram programming methods: root instruction scheme; step-by-step instruction scheme; shift instruction scheme. Flash, you can set or correct skill process parameters, and have an early warning system and defect flash indicator to monitor the production process, and then greatly advance the function of the entire machine. The transformation cost of PLC control system is low, the construction period is short, the reliability and safety of the system are significantly improved, and it has certain application value.

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

亚洲精品国产电影| 男女裸体影院高潮| 色妞ww精品视频7777| 国产欧美精品一区二区三区四区| 国产日韩精品中文字无码| 娜娜麻豆国产电影| 欧美gv在线观看| 99久久精品免费看国产| 中国老太婆bb无套内射| 久久99国产精品久久99果冻传媒| 大地资源在线影视播放| 国产午夜福利100集发布| 18成人片黄网站www| 99久久99久久精品免费看蜜桃| 红杏亚洲影院一区二区三区| 亚洲国产精品第一区二区| 久久午夜神器| 男人激烈吮乳吃奶视频免费 | 无套内射无矿码免费看黄| 日本欧美大码a在线观看| 亚洲色偷偷色噜噜狠狠99网| 国产69久久精品成人看| 色翁荡熄又大又硬又粗又视频| 亚洲午夜久久久久妓女影院| 免费人成网站视频在线观看国内| 精品亚洲成在人线av无码| 国产精品美女一区二区视频| 国产成人av一区二区三区在线| 特级做a爰片毛片免费看108| 漂亮人妻洗澡被公强 日日躁| 日本特黄特色特爽大片| 在线永久免费观看黄网站| 无码少妇一区二区三区| 欧美老妇交乱视频在线观看 | 久久综合伊人| 精品伊人久久大线蕉色首页| 亚洲av无码国产精品永久一区| 插插无码视频大全不卡网站| 亚洲国产欧美国产综合一区| 亚洲av无码一区二区三区天堂| 色婷婷一区二区三区四区成人网|